BOOKMARK this page:



clix - ñîöèàëüíûå çàêëàäêè
Annual average rate of 2007:
1 USD ($ USD)   = 29.39 rub.
1 EUR (€)           = 41,42 rub.

Currencies exchange rates (as of 11.06.2010): 
1 USD ($ USD)  = 31.5742 rub.
1 EUR (€)          = 38.0217 rub.

15.01.2010  
Inflation
                      0.7% Èçì. 0%
Gold and currency reserves        441.4 bln. USD
Oil Brent (ICE)         71.62
                          USD/ barrel
GDP               II êâàðòàë 2009 ãîä 9 326,4 bln. Rub.
Exports            24,5 Èçì 1,8 bln. USD
Imports           15.5 Èçì. 1.6 bln. USD
Fixed asset
investments
   01.07.09ã. 621,7 Èçì. -49.4 bln. Rub.
Consumer price index
(as of 01.8 / 31.08.2009)
  100 Èçì. 0% - for food
commodities
              99.1 Èçì. - 1.5%
- for non-food
products
                   100.6 Èçì. - 0.2%
- for paid services rendered to the population         100.4 Èçì. - 0.4%
Forecast rates on                         
1 USD ($ USD) = rub.
1 EUR (€)          = rub.
Ðóññêèé  /  English

Yaroslavl Ring motor-racing track

Detail overview
GENERAL INFORMATION
Region
Municipality, City, District
Yaroslavl municipal district
Brief positioning of project
The investment project envisages creation of a sports facility including a racing track for ring road races and all necessary infrastructure objects making it possible to hold international level competitions. The facility will include and a motor racing center for children and teenagers. It is expected that Hermann Tilke design bureau will participate in design of the motor-racing track. Creation of the motor-racing track will permit: — promotion of child and teenage sports; — ability to hold world-class competitions within the Region; — increase of the overall investment appeal of the Region; — formation of a large recreation and sports development center both for the Region inhabitants and its visitors; — creation of additional jobs. The motor-racing track is targeted at car and motor fans of both Yaroslavl Region and adjacent regions; — sportsmen who train and participate in ring road races; — children trained at a sports school; — companies manufacturing automotive equipment, car dealers holding their presentation and shows.
PLOT
Area
330 ha
Extension options
yes
LOCATION
Nearest Industry and/or infrastructure objects
Federal highway No. M8, Moscow — Holmogory
Prom: Distance to them (km)
in immediate proximity from the selected land plot (50 to 100 m)
Restrictions
no
Remoteness
Center of the constituent subject
Distance to Yaroslavl city is 18 km
Nearest Millionaire City
Moscow
millionaire city — distance km
220
Municipality education building
Yaroslav
municipality — distance, km
18
Highways
Moscow — Holmogory highway
highways — distance, km
0.05 km
Railways
Kozmodemyansk, Northern Railway
railways — distance, km
4
Airports
Tunoshna
airports — distance km
30
River ports, landing stages
Yaroslavl river port
river ports, landing stages — distance, km
20
OWN TRANSPORT FACILITIES
Communication type (motorway)
no
Communication type (railway branch)
no
Communication type (port, landing stage)
no
Communication type (post/telecommunications
no
Suggestions for site use
Motor roads, communication lines and power transmission line run within the site
PROJECT INVESTMENT COSTS
Preparation of design and estimate documentation (
no
Preparation of design and estimate documentation (
no
Preparation of design and estimate documentation (
no
Preparation of design and estimate documentation (
no
Preparation of design and estimate documentation (
yes
Comment
Collection of initial permitting documentation is in progress. By now, technical conditions and approvals have bee collected from the Commission for Land and Property Relations and Urban Development of Yaroslavl Municipal District, Upper Volga Branch of OAO Centertelecom, OAO Yarenergo, OAO Yaroslavloblgaz, Department of Road Facilities of Yaroslavl Region, EMERCOM Main Directorate for Yaroslavl Region, Water Directorate of Upper Volga Basin, State Traffic Safety Inspection Directorate for Yaroslavl Region.
Expert examination of design and estimate document
no
Execution of construction and assembly works
no
Supervision of construction and assembly works
no
Financial consultants’ services
no
Repayment of interest on credit
no
Project costs (office services, sales, salaries)
yes
Current project status
Finalization of documents for the land plot, collection of technical conditions and approvals.
ECONOMIC INDICATORS
Payback time, years
12-15

Back to the list of projects

Exhibition operator - FORMIKA
 

© Group of companies FORMIKA, 2007-2009.
Copying and use all parts of the site in any form is forbidden.